Guide for builders and owner builders

How to Prepare a Window Schedule for a Quote

A window schedule is the document every window quote is built from. Here is what to put in it, how to mark glazing, BAL and acoustic requirements, and a free template to start from.

Timber frame opening ready to be measured for a uPVC window

A window schedule lists every window and external door on a building, one row per opening, with the information a manufacturer needs to price and make it. A complete schedule gets a complete quote back. A schedule with gaps gets a quote full of assumptions, or a string of questions before anyone can price it. This guide covers what a schedule is for, the columns it needs, how to mark the compliance requirements, and the mistakes that slow a quote down.

What a Window Schedule Is For

The schedule is the single source of truth for the openings in a building. The draftsperson or architect sets the sizes and styles on it, the engineer sizes lintels around it, the carpenter frames to it, and the window supplier quotes and manufactures from it. That is why the schedule matters more than any single drawing: it is the document every trade refers back to.

For a quote, the schedule does three jobs. It tells us how many units there are and what each one is. It tells us what each unit has to achieve, from the BASIX glazing commitments to the BAL and acoustic requirements. And it gives every unit a mark, so the quote, the order, the delivery and the installation all refer to the same opening.

Width 1200 Height 1500 W02 Viewed from outside Dashed lines point to the hinge side. Left sash: hinged left. Right sash: fixed. Mark W02 matches the schedule row. Sizes are overall frame, in millimetres.
Illustration of one schedule entry. Not to scale.

The Columns Every Schedule Needs

Most schedules come out of the drafting software already, but they often leave out the columns a window supplier needs. These are the ones that let us price accurately the first time:

ColumnExampleWhy we need it
MarkW01, W02, D01The label on the plan, so every unit traces back to one opening
Room and elevationBed 2, northTells us orientation, privacy and which reports apply
Width x height (mm)1200 x 1500Overall frame size; final sizes are measured on the built frame
StyleAwning, tilt and turn, sliding doorThe opening type for each unit
Opening directionHinged left, slides rightViewed from outside, so nothing is made the wrong hand
GlazingDouble glazed Low-E, obscureFrom the BASIX certificate and any privacy needs
BALBAL-29From the bushfire assessment, per elevation
AcousticLaminated 10.38 / 12 / 6Only where an acoustic report sets a build-up
Colour and hardwareBlack outside, white insideFinish and handle colour
ScreensFlyscreen, BAL screenInsect or bushfire screens where needed
NotesRestrictor, safety glassWindow safety devices, toughened glass zones, anything unusual

Here is what a few rows look like when they are filled in properly:

MarkRoom / elevationW x H (mm)StyleGlazingBALNotes
W01Kitchen / east1800 x 900Awning (2 sash)Double glazed Low-EBAL-19
W02Bed 2 / north1200 x 1500Tilt and turnDouble glazed Low-EBAL-19Window safety device
W03Ensuite / west600 x 900AwningDouble glazed, obscureBAL-19Toughened
D01Living / north3600 x 2400Sliding door (3 panel)Acoustic laminatedBAL-19Per acoustic report

Example only: the glazing, BAL and acoustic entries come from your own BASIX certificate, bushfire assessment and acoustic report.

Free template. Start from our window schedule template (CSV). It opens in Excel or Google Sheets with every column above ready to fill in.

Marking Glazing, BAL and Acoustic Requirements

Three documents usually set the glass before anyone chooses a colour, and the schedule should carry what each one says.

  • BASIX. Every new home in NSW needs a BASIX certificate, and it lists the windows and glazed doors with their sizes, frame type and glazing type. Copy the glazing type for each opening into the schedule, because what is installed has to match the certificate.
  • BAL. On bushfire prone land the bushfire assessment sets a BAL for each elevation, and it decides the glass, the seals and any screens. Mark the BAL against every opening on that elevation, not once at the top of the page.
  • Acoustic. Near main roads, rail lines and flight paths an acoustic report may set a glazing build-up per elevation or per room. Copy the build-up exactly as the report states it.

Two more notes save a lot of back and forth: mark the openings that need safety glass, such as glass near doors, bathrooms and low sills, and mark bedroom windows that need a window safety device to restrict the opening.

Common Mistakes That Slow a Quote

  • Sizes without a mark. Without W01, W02, the quote cannot be matched back to the plan, so every query takes twice as long.
  • Opening direction left off. A hinged window or door made the wrong hand is a remake. Always state the hinge side, viewed from outside.
  • BAL on the cover sheet only. The BAL often differs by elevation. Put it on every row.
  • Acoustic build-up paraphrased. Copy the report's build-up exactly; laminated glass of a different thickness is a different product.
  • No lock-up date. The lead time is worked back from the date the building needs to be closed. Without it, nobody can confirm the programme.
  • Supply only or supply and install not stated. The two prices describe different jobs and cannot be compared.

Send Us Your Schedule

Send the schedule with the elevations, the BASIX certificate, the bushfire assessment if there is one, any acoustic report, your target lock-up date, and whether you want supply only or supply and install. We price every opening from it and come back with an itemised quote.

If you build regularly, our page for builders and developers explains how we work with trade customers. Building your own home? See new home windows for how we quote a whole house.

Frequently Asked Questions

What is a window schedule?

A window schedule is a table that lists every window and external door on a building, one row per opening, with its mark, size, style, opening direction and glazing. Trades and suppliers use it to frame, price and manufacture the openings.

Who prepares the window schedule?

Usually the architect or draftsperson, as part of the plan set. Builders and owner builders often add the glazing, BAL and acoustic details from the reports before sending it for quotes.

Are the sizes on the schedule the final sizes?

No. The schedule sizes are used to quote, but the units are manufactured to sizes measured on the built frame, because built openings are never exactly the drawn size.

Do I need to put the BASIX glazing on the schedule?

Yes. The windows installed have to match the glazing types on the BASIX certificate, so copying them into the schedule makes sure the quote prices the right glass.

Can you quote without a schedule?

We can quote from the plans and elevations, but a schedule is faster and more accurate. Our free template is a quick way to put one together.

Free measure and quote

Send Us Your Window Schedule

Upload the schedule, plans and reports and we will come back with an itemised price for every opening.

  • Made to measure in our Wetherill Park factory
  • Fitted by our own installers, no subcontractors
  • 10 year frame warranty backed by the profile manufacturer
  • Reno Now, Pay Later available

Prefer to talk? (02) 8747 0471 or 0416 666 226

Book your free measure and quote

Takes about a minute.

No obligation. We reply within business hours, Monday to Saturday.